NB SR-7 NW 7&2 Av over SR-9A & 9, I-95
Map
Coordinates:
+25.57056, -80.3775025°34'14" N, 80°22'39" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | NB SR-7 NW 7&2 Av over SR-9A & 9, I-95 |
| Structure number: | 870243 |
| Location: | NB SR-7 over I-95 G. Glad |
| Purpose: | Carries highway over highway and railroad |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 146.0 ft. [44.5 m] |
| Total length: | 766.1 ft. [233.5 m] |
| Roadway width between curbs: | 27.9 ft. [8.5 m] |
| Deck width edge-to-edge: | 34.1 ft. [10.4 m] |
| Vertical clearance above deck: | 18.0 ft. [5.5 m] |
| Vertical clearance below bridge: | 16.4 ft. [5.0 m] |
| Skew angle: | 30° |
| Owner: | State Highway Agency [01] |
| Year built: | 1963 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 2 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Integral Concrete (separate non-modified layer of concrete added to structural deck) [2] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 28,500 [as of 2007] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 80.3 tons [73.0 metric tons] |
| Inventory rating: | 48.4 tons [44.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 79.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 25,985 [as of 1988] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 80.3 tons [73.0 metric tons] |
| Inventory rating: | 48.4 tons [44.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 75.0 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 25,985 [as of 1988] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 56.4 tons [51.3 metric tons] |
| Inventory rating: | 36.6 tons [33.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 75.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $72,000 |