Share:

SR 112 (EB) over NW 22 AVE

Map 

Coordinates:
+25.81194, -80.23194
25°48'43" N, 80°13'55" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 112 (EB) over NW 22 AVE
Structure number:870276
Location:2.0 Miles E/O NW 42ND AVE
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Tolls:Yes, on toll road [2]
Length of largest span:90.6 ft. [27.6 m]
Total length:171.9 ft. [52.4 m]
Roadway width between curbs:39.4 ft. [12.0 m]
Deck width edge-to-edge:45.9 ft. [14.0 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Owner:State Toll Authority [31]
Year built:1960
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:43,000 [as of 2009]
Truck traffic:6% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:53.7 tons [48.8 metric tons]
Inventory rating:32.2 tons [29.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.6

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:108,000 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:53.7 tons [48.8 metric tons]
Inventory rating:32.2 tons [29.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:69.5

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:29,774 [as of 1988]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:57.4 tons [52.2 metric tons]
Inventory rating:49.5 tons [45.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.1