I-95SB TO SR-112WB over NW 10 AVE
Map
Coordinates:
+25.81278, -80.2116725°48'46" N, 80°12'42" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-95SB TO SR-112WB over NW 10 AVE |
| Structure number: | 870335 |
| Location: | 0.2MI E OF TOLL PLAZA |
| Purpose: | Carries highway overpass over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Tolls: | Yes, on toll road [2] |
| Length of largest span: | 63.0 ft. [19.2 m] |
| Total length: | 145.0 ft. [44.2 m] |
| Roadway width between curbs: | 73.8 ft. [22.5 m] |
| Deck width edge-to-edge: | 79.4 ft. [24.2 m] |
| Vertical clearance below bridge: | 15.1 ft. [4.6 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1962 |
| Year reconstructed: | 1989 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 59,000 [as of 2010] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 87.0 tons [79.1 metric tons] |
| Inventory rating: | 53.6 tons [48.7 metric tons] |
| Sufficiency rating: | 94.2 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 51,000 [as of 1998] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Inventory rating: | 69.0 tons [62.7 metric tons] |
| Sufficiency rating: | 88.5 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,000 [as of 1989] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 62.4 tons [56.7 metric tons] |
| Inventory rating: | 55.4 tons [50.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 72.5 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $5,000 |