I-95 NB (870309) over NW 71-75 ST & RR
Map
Coordinates:
+25.84139, -80.2058325°50'29" N, 80°12'21" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-95 NB (870309) over NW 71-75 ST & RR |
| Structure number: | 870430 |
| Location: | AT NW 71 ST |
| Purpose: | Carries highway over highway and railroad |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 76.1 ft. [23.2 m] |
| Total length: | 1506.0 ft. [459.0 m] |
| Roadway width between curbs: | 94.5 ft. [28.8 m] |
| Deck width edge-to-edge: | 97.4 ft. [29.7 m] |
| Vertical clearance below bridge: | 17.1 ft. [5.2 m] |
| Skew angle: | 10° |
| Owner: | State Highway Agency [01] |
| Year built: | 1959 |
| Year reconstructed: | 1995 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 23 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 113,000 [as of 2009] |
| Truck traffic: | 3% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 97.7 tons [88.8 metric tons] |
| Inventory rating: | 58.6 tons [53.3 metric tons] |
| Sufficiency rating: | 92.7 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 120,000 [as of 1997] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 108.9 tons [99.0 metric tons] |
| Inventory rating: | 67.1 tons [61.0 metric tons] |
| Sufficiency rating: | 88.1 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 105,107 [as of 1989] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 50.5 tons [45.9 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 81.5 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $29,000 |