I-95 SB TO US-41 over SW 6 ST-NW 2 ST MIA RV
Map
Coordinates:
+25.76694, -80.2008325°46'01" N, 80°12'03" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-95 SB TO US-41 over SW 6 ST-NW 2 ST MIA RV |
| Structure number: | 870479 |
| Location: | DOWNTOWN INTRCHG |
| Purpose: | Carries highway overpass (third level) over highway and waterway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 200.1 ft. [61.0 m] |
| Total length: | 2885.0 ft. [879.3 m] |
| Roadway width between curbs: | 23.0 ft. [7.0 m] |
| Deck width edge-to-edge: | 25.9 ft. [7.9 m] |
| Vertical clearance above deck: | 17.1 ft. [5.2 m] |
| Vertical clearance below bridge: | 74.8 ft. [22.8 m] |
| Skew angle: | 99° |
| Owner: | State Highway Agency [01] |
| Year built: | 1969 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 9 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 75,000 [as of 2008] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 63.6 tons [57.8 metric tons] |
| Inventory rating: | 38.2 tons [34.7 metric tons] |
| Sufficiency rating: | 82.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $551,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 60,500 [as of 1997] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 67.1 tons [61.0 metric tons] |
| Inventory rating: | 39.6 tons [36.0 metric tons] |
| Sufficiency rating: | 99.0 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 15,600 [as of 1989] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 63.4 tons [57.6 metric tons] |
| Inventory rating: | 37.6 tons [34.2 metric tons] |
| Sufficiency rating: | 98.0 |
| Estimated cost of work: | $39,000 |