Share:

NW 58 ST over SR-826

Map 

Coordinates:
+25.82611, -80.32167
25°49'34" N, 80°19'18" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:NW 58 ST over SR-826
Structure number:870553
Location:N.W. 58th St / SR 826
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Local (Urban) [19]
Length of largest span:105.6 ft. [32.2 m]
Total length:211.0 ft. [64.3 m]
Roadway width between curbs:91.9 ft. [28.0 m]
Deck width edge-to-edge:112.9 ft. [34.4 m]
Vertical clearance above deck:22.0 ft. [6.7 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:State Highway Agency [01]
Year built:1974
Year reconstructed:2000
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:47,176 [as of 2007]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge not over waterway. [N]
Operating rating:108.9 tons [99.0 metric tons]
Inventory rating:84.7 tons [77.0 metric tons]
Sufficiency rating:88.9

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,500 [as of 1997]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:108.9 tons [99.0 metric tons]
Inventory rating:84.7 tons [77.0 metric tons]
Sufficiency rating:97.2

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:5,000 [as of 1988]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:44.6 tons [40.5 metric tons]
Inventory rating:36.6 tons [33.3 metric tons]
Sufficiency rating:97.2