SR854 EB (870576) over SCL R/R

Map 

Coordinates:
+25.81139, -80.19056
25°48'41" N, 80°11'26" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR854 EB (870576) over SCL R/R
Structure number:870577
Location:W OF I-95
Purpose:Carries highway over highway and railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:61.0 ft. [18.6 m]
Total length:196.9 ft. [60.0 m]
Roadway width between curbs:65.6 ft. [20.0 m]
Deck width edge-to-edge:82.0 ft. [25.0 m]
Vertical clearance below bridge:24.3 ft. [7.4 m]
Owner:State Highway Agency [01]
Year built:1970
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:33,143 [as of 2005]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:88.0 tons [80.0 metric tons]
Inventory rating:52.8 tons [48.0 metric tons]
Sufficiency rating:95.4

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,466 [as of 1989]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:88.0 tons [80.0 metric tons]
Inventory rating:52.8 tons [48.0 metric tons]
Sufficiency rating:96.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:20,466 [as of 1989]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Sufficiency rating:94.4
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$9,000