I-395 EB RAMP over NE MIAMI CT & NE 1 AVE
Map
Coordinates:
+25.78556, -80.1922225°47'08" N, 80°11'32" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-395 EB RAMP over NE MIAMI CT & NE 1 AVE |
| Structure number: | 870584 |
| Location: | E OF MIDTOWN INT |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 106.0 ft. [32.3 m] |
| Total length: | 530.9 ft. [161.8 m] |
| Roadway width between curbs: | 22.6 ft. [6.9 m] |
| Deck width edge-to-edge: | 25.6 ft. [7.8 m] |
| Vertical clearance above deck: | 20.0 ft. [6.1 m] |
| Vertical clearance below bridge: | 14.4 ft. [4.4 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1970 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 8 |
| Main spans material: | Prestressed concrete [5] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 7,430 [as of 2009] |
| Truck traffic: | 7% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 78.9 tons [71.7 metric tons] |
| Inventory rating: | 47.3 tons [43.0 metric tons] |
| Sufficiency rating: | 96.0 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,133 [as of 1989] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 79.2 tons [72.0 metric tons] |
| Inventory rating: | 47.3 tons [43.0 metric tons] |
| Sufficiency rating: | 96.2 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 13,133 [as of 1989] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 45.5 tons [41.4 metric tons] |
| Inventory rating: | 38.6 tons [35.1 metric tons] |
| Sufficiency rating: | 95.0 |
| Estimated cost of work: | $27,000 |