NW 7th Street over Wagner Creek Canal

Map 

Coordinates:
+25.78028, -80.20722
25°46'49" N, 80°12'26" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:NW 7th Street over Wagner Creek Canal
Structure number:876400
Location:260 ft. West of US 441
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Urban) [19]
Length of largest span:62.0 ft. [18.9 m]
Total length:62.0 ft. [18.9 m]
Roadway width between curbs:32.5 ft. [9.9 m]
Deck width edge-to-edge:34.5 ft. [10.5 m]
Owner:City or Municipal Highway Agency [04]
Year built:1919
Historic significance:Historical significance is not determinable at this time [4]
Design load:MS 18 / HS 20 [5]
Main span material:Concrete [1]
Main span design:Arch - Deck [11]
Deck type:Not applicable [N]
Wearing surface:Other [9]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:418 [as of 2004]
Truck traffic:2% of total traffic
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:88.3 tons [80.3 metric tons]
Inventory rating:52.7 tons [47.9 metric tons]
Sufficiency rating:97.9
Estimated cost of work:$120,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:418 [as of 2000]
Truck traffic:2% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:98.8 tons [89.8 metric tons]
Inventory rating:98.8 tons [89.8 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:71.9
Estimated cost of work:$120,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:400 [as of 1992]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$122,000