Share:

OLD SR 5 over TOCCOA RIVER

Map 

Coordinates:
+34.98743, -84.37066
34°59'15" N, 84°22'14" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:OLD SR 5 over TOCCOA RIVER
Structure number:000000011150420
Location:IN MCCAYSVILLE
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Local (Rural) [09]
Length of largest span:149.9 ft. [45.7 m]
Total length:180.8 ft. [55.1 m]
Roadway width between curbs:17.7 ft. [5.4 m]
Deck width edge-to-edge:17.7 ft. [5.4 m]
Vertical clearance above deck:12.1 ft. [3.7 m]
Owner:City or Municipal Highway Agency [04]
Year built:1928
Year reconstructed:1935
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 13.5 / H 15 [2]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, posting recommended but not legally implemented [B]
Average daily traffic:620 [as of 2007]
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:30.7 tons [27.9 metric tons]
Inventory rating:17.8 tons [16.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:28.6

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:850 [as of 1998]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:22.7 tons [20.6 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:40.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,205,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:850 [as of 1990]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:22.8 tons [20.7 metric tons]
Inventory rating:10.9 tons [9.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:27.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]