NORTHSIDE DRIVE over PEACHTREE CREEK

Map 

Coordinates:
+33.82026, -84.40754
33°49'13" N, 84°24'27" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:NORTHSIDE DRIVE over PEACHTREE CREEK
Structure number:000000012100130
Location:IN NORTH ATLANTA
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:43.0 ft. [13.1 m]
Total length:125.0 ft. [38.1 m]
Roadway width between curbs:32.5 ft. [9.9 m]
Deck width edge-to-edge:40.0 ft. [12.2 m]
Owner:State Highway Agency [01]
Year built:1926
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 13.5 / H 15 [2]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: April 2015 

Status:Open, no restriction [A]
Average daily traffic:13,670 [as of 2012]
Truck traffic:1% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Meets minimum tolerable limits to be left in place as is [4]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Basically intolerable requiring high priority of replacement [2]
Roadway alignment appraisal:Better than present minimum criteria [7]
Channel protection:Bank protection has failed. River control devices have been destroyed. Stream bed aggradation, degradation or lateral movement has changed the channel to now threaten the bridge and/or approach roadway. [3]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:20.8 tons [18.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:41.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$932,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
April 201541.2Structurally deficientFairFairFair13670
May 201341.2Structurally deficientFairFairFair13670
May 201142.6Structurally deficientSatisfactoryFairFair13250
August 200944.4Structurally deficientSatisfactoryFairFair9540
June 200742.7Structurally deficientSatisfactoryFairFair13010
June 200541.6Structurally deficientSatisfactoryFairFair15400
May 200342.7Structurally deficientSatisfactoryFairFair13200
July 200141.5Structurally deficientSatisfactoryFairFair15550
October 199941.5Structurally deficientSatisfactoryFairFair15550
October 199641.5Structurally deficientSatisfactoryFairFair15550
December 199440.1Structurally deficientSatisfactoryFairFair15550
June 199250.1Structurally deficientSatisfactoryFairFair15550
June 199050.3Structurally deficientSatisfactoryFairFair14970