MCDONOUGH BLVD. over NORFOLK-SOUTHERN RR
Map
Coordinates:
+33.71736, -84.3799033°43'02" N, 84°22'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | MCDONOUGH BLVD. over NORFOLK-SOUTHERN RR |
| Structure number: | 000000012100510 |
| Location: | .3 MI E OF SR 54 |
| Purpose: | Carries highway and pedestrian walkway over railroad |
| Route classification: | Minor Arterial (Urban) [16] |
| Length of largest span: | 45.9 ft. [14.0 m] |
| Total length: | 170.0 ft. [51.8 m] |
| Roadway width between curbs: | 34.8 ft. [10.6 m] |
| Deck width edge-to-edge: | 52.2 ft. [15.9 m] |
| Vertical clearance below bridge: | 20.0 ft. [6.1 m] |
| Skew angle: | 47° |
| Owner: | State Highway Agency [01] |
| Year built: | 1924 |
| Historic significance: | Bridge is eligible for the National Register of Historic Places [2] |
| Design load: | M 13.5 / H 15 [2] |
| Number of main spans: | 4 |
| Main spans material: | Concrete [1] |
| Main spans design: | Tee beam [04] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Bituminous [6] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 28,310 [as of 2007] |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 37.6 tons [34.2 metric tons] |
| Inventory rating: | 19.8 tons [18.0 metric tons] |
| Sufficiency rating: | 55.5 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,049,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 28,010 [as of 1998] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 37.6 tons [34.2 metric tons] |
| Inventory rating: | 19.8 tons [18.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 53.3 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $1,049,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 28,010 [as of 1990] |
| Truck traffic: | 4% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 46.5 tons [42.3 metric tons] |
| Inventory rating: | 19.8 tons [18.0 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 52.8 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |