Share:

MCDONOUGH BLVD. over NORFOLK-SOUTHERN RR

Map 

Coordinates:
+33.71736, -84.37990
33°43'02" N, 84°22'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MCDONOUGH BLVD. over NORFOLK-SOUTHERN RR
Structure number:000000012100510
Location:.3 MI E OF SR 54
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:45.9 ft. [14.0 m]
Total length:170.0 ft. [51.8 m]
Roadway width between curbs:34.8 ft. [10.6 m]
Deck width edge-to-edge:52.2 ft. [15.9 m]
Vertical clearance below bridge:20.0 ft. [6.1 m]
Skew angle:47°
Owner:State Highway Agency [01]
Year built:1924
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 13.5 / H 15 [2]
Number of main spans:4
Main spans material:Concrete [1]
Main spans design:Tee beam [04]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,310 [as of 2007]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:37.6 tons [34.2 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Sufficiency rating:55.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,049,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,010 [as of 1998]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:37.6 tons [34.2 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:53.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,049,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:28,010 [as of 1990]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:46.5 tons [42.3 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:52.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]