Share:

GORDON STREET over ABANDONED RAILROAD

Map 

Coordinates:
+33.73896, -84.43311
33°44'20" N, 84°25'59" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:GORDON STREET over ABANDONED RAILROAD
Structure number:000000012100820
Location:IN W ATLANTA
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:17.7 ft. [5.4 m]
Total length:34.8 ft. [10.6 m]
Roadway width between curbs:69.9 ft. [21.3 m]
Deck width edge-to-edge:86.9 ft. [26.5 m]
Vertical clearance below bridge:19.7 ft. [6.0 m]
Skew angle:30°
Owner:State Highway Agency [01]
Year built:1906
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:M 13.5 / H 15 [2]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,120 [as of 2007]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:42.6 tons [38.7 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:68.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$265,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,807 [as of 1998]
Truck traffic:9% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:42.6 tons [38.7 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Sufficiency rating:72.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$265,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,807 [as of 1990]
Truck traffic:9% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:42.6 tons [38.7 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:49.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]