Share:

I-75 over M-9205 COLLIER ROAD

Map 

Coordinates:
+33.81018, -84.41903
33°48'37" N, 84°25'09" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-75 over M-9205 COLLIER ROAD
Structure number:000000012101490
Location:IN N ATLANTA
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:49.9 ft. [15.2 m]
Total length:137.8 ft. [42.0 m]
Roadway width between curbs:170.6 ft. [52.0 m]
Deck width edge-to-edge:176.8 ft. [53.9 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Skew angle:15°
Owner:State Highway Agency [01]
Year built:1956
Year reconstructed:1985
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:181,620 [as of 2007]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:45.5 tons [41.4 metric tons]
Inventory rating:27.7 tons [25.2 metric tons]
Sufficiency rating:78.7

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:220,300 [as of 1998]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:45.4 tons [41.3 metric tons]
Inventory rating:27.6 tons [25.1 metric tons]
Sufficiency rating:77.6

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:146,960 [as of 1990]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:51.5 tons [46.8 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:79.0