Facts 

Name:I-20 over CS 1575 LUCILE AVE.
Structure number:000000012101770
Location:IN W ATLANTA
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:150.9 ft. [46.0 m]
Total length:286.8 ft. [87.4 m]
Roadway width between curbs:128.0 ft. [39.0 m]
Deck width edge-to-edge:131.2 ft. [40.0 m]
Vertical clearance below bridge:14.1 ft. [4.3 m]
Skew angle:32°
Owner:State Highway Agency [01]
Year built:1963
Year reconstructed:1981
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:169,790 [as of 2007]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:59.4 tons [54.0 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:82.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,856,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:124,500 [as of 1998]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:49.5 tons [45.0 metric tons]
Inventory rating:29.7 tons [27.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,856,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:109,140 [as of 1990]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:52.5 tons [47.7 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:81.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]