Share:

CHILDRESS DRIVE over SOUTH UTOY CREEK

Map 

Coordinates:
+33.71511, -84.49046
33°42'54" N, 84°29'26" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CHILDRESS DRIVE over SOUTH UTOY CREEK
Structure number:000000012103500
Location:IN WEST ATLANTA
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:42.0 ft. [12.8 m]
Total length:42.0 ft. [12.8 m]
Roadway width between curbs:20.3 ft. [6.2 m]
Deck width edge-to-edge:23.3 ft. [7.1 m]
Skew angle:38°
Owner:City or Municipal Highway Agency [04]
Year built:1938
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:4,510 [as of 2007]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:27.7 tons [25.2 metric tons]
Inventory rating:23.8 tons [21.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:65.1
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$138,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,370 [as of 1998]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:27.6 tons [25.1 metric tons]
Inventory rating:23.8 tons [21.6 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:64.6
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$138,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,250 [as of 1990]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:33.7 tons [30.6 metric tons]
Inventory rating:21.8 tons [19.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:61.3
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]