Share:

BOHLER ROAD over PEACHTREE CREEK

Map 

Coordinates:
+33.82232, -84.42929
33°49'20" N, 84°25'45" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:BOHLER ROAD over PEACHTREE CREEK
Structure number:000000012103980
Location:IN N ATLANTA
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:44.0 ft. [13.4 m]
Total length:88.9 ft. [27.1 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:24.9 ft. [7.6 m]
Owner:City or Municipal Highway Agency [04]
Year built:1916
Year reconstructed:1946
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Number of main spans:3
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: November 2014 

Status:Open, no restriction [A]
Average daily traffic:3,500 [as of 2011]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Equal to present desirable criteria [8]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:96.0 tons [87.3 metric tons]
Inventory rating:57.4 tons [52.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:66.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$522,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
November 201466.8Functionally obsoleteGoodSatisfactoryFair3500
November 201266.8Functionally obsoleteGoodSatisfactoryFair3500
November 201066.7Functionally obsoleteGoodSatisfactoryFair4420
December 200866.7Functionally obsoleteGoodSatisfactoryFair4420
January 200766.9Functionally obsoleteGoodSatisfactoryFair2090
January 200577.8Functionally obsoleteGoodSatisfactorySatisfactory3160
February 200377.8Functionally obsoleteGoodSatisfactorySatisfactory3100
November 200058.9Functionally obsoleteGoodSatisfactorySatisfactory11370
June 199858.9Functionally obsoleteSatisfactorySatisfactorySatisfactory11370
January 199558.5Functionally obsoleteSatisfactorySatisfactorySatisfactory10460
January 199358.6Functionally obsoleteSatisfactorySatisfactorySatisfactory9800
January 199156.9Functionally obsoleteSatisfactorySatisfactorySatisfactory9800