Share:

COLLIER ROAD over PEACHTREE CREEK TRIB

Map 

Coordinates:
+33.80858, -84.43535
33°48'31" N, 84°26'07" W
Source: National Bridge Inventory
Information not verified. Use at your own risk.

Facts 

Name:COLLIER ROAD over PEACHTREE CREEK TRIB
Structure number:000000012104350
Location:IN N ATLANTA
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:41.0 ft. [12.5 m]
Total length:41.0 ft. [12.5 m]
Roadway width between curbs:24.0 ft. [7.3 m]
Deck width edge-to-edge:27.9 ft. [8.5 m]
Owner:City or Municipal Highway Agency [04]
Year built:1936
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Main span material:Steel [3]
Main span design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

Latest Available Inspection: December 2014 

Status:Open, no restriction [A]
Average daily traffic:6,970 [as of 2011]
Truck traffic:1% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Structural appraisal:Somewhat better than minimum adequacy to tolerate being left in place as is [5]
Deck geometry appraisal:Basically intolerable requiring high priority of replacement [2]
Water adequacy appraisal:Basically intolerable requiring high priority of replacement [2]
Roadway alignment appraisal:Equal to present desirable criteria [8]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:43.6 tons [39.6 metric tons]
Inventory rating:25.7 tons [23.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:53.6
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$240,000

Previous Inspections 

DateSuff. ratingEvaluationDeckSuper.Sub.ADT
December 201453.6Structurally deficientGoodFairGood6970
December 201253.6Structurally deficientGoodFairGood6970
December 201053.6Structurally deficientGoodFairGood6590
January 200963.7Structurally deficientGoodSatisfactoryGood6590
February 200763.7Structurally deficientGoodSatisfactoryGood6450
February 200566.0Structurally deficientGoodSatisfactoryGood7280
February 200366.0Structurally deficientGoodSatisfactoryGood6300
November 200065.7Structurally deficientGoodSatisfactoryGood11370
July 199865.7Structurally deficientGoodSatisfactoryGood11370
January 199565.3Structurally deficientGoodSatisfactoryGood10460
January 199365.4Structurally deficientGoodSatisfactoryGood9700
February 199170.8Structurally deficientGoodGoodGood9500