Share:

CAPITOL AVE. over I-20- I-75 RMP- I-20 RMP

Map 

Coordinates:
+33.74419, -84.38775
33°44'39" N, 84°23'16" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CAPITOL AVE. over I-20- I-75 RMP- I-20 RMP
Structure number:000000012106530
Location:I-20 & I-75 INTERCHANGE
Purpose:Carries highway and pedestrian walkway over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:195.9 ft. [59.7 m]
Total length:542.0 ft. [165.2 m]
Roadway width between curbs:65.9 ft. [20.1 m]
Deck width edge-to-edge:88.3 ft. [26.9 m]
Vertical clearance below bridge:19.4 ft. [5.9 m]
Skew angle:27°
Owner:State Highway Agency [01]
Year built:1988
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,180 [as of 2007]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:80.3

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,500 [as of 1998]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:35.5 tons [32.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:80.1

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,151 [as of 1990]
Truck traffic:4% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:79.5