Share:

I-75 RMP TO I-20WB over M9164 & RMP- M9166 & RMP

Map 

Coordinates:
+33.74600, -84.39317
33°44'46" N, 84°23'35" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I-75 RMP TO I-20WB over M9164 & RMP- M9166 & RMP
Structure number:000000012107060
Location:I-75 & I-20 INTERCHANGE
Purpose:Carries highway over highway
Route classification:Local (Urban) [19]
Length of largest span:190.0 ft. [57.9 m]
Total length:519.7 ft. [158.4 m]
Roadway width between curbs:43.0 ft. [13.1 m]
Deck width edge-to-edge:45.9 ft. [14.0 m]
Vertical clearance below bridge:31.5 ft. [9.6 m]
Owner:State Highway Agency [01]
Year built:1989
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Prestressed concrete continuous [6]
Main spans design:Box Beam or girders - Single or Spread [06]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 2006]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:94.5

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1999]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:35.5 tons [32.3 metric tons]
Sufficiency rating:96.5

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,000 [as of 1989]
Truck traffic:4% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:60.4 tons [54.9 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:97.5