Share:

SR 400 (NBL) over M-9245 OLD IVY ROAD

Map 

Coordinates:
+33.85748, -84.36930
33°51'27" N, 84°22'09" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 400 (NBL) over M-9245 OLD IVY ROAD
Structure number:000000012107430
Location:IN N ATLANTA
Purpose:Carries highway over highway
Route classification:Principal Arterial - Other Freeways or Expressways (Urban) [12]
Tolls:Yes, on toll road [2]
Length of largest span:65.0 ft. [19.8 m]
Total length:179.8 ft. [54.8 m]
Roadway width between curbs:83.7 ft. [25.5 m]
Deck width edge-to-edge:86.9 ft. [26.5 m]
Vertical clearance below bridge:16.4 ft. [5.0 m]
Owner:State Highway Agency [01]
Year built:1992
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Prestressed concrete [5]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:112,460 [as of 2007]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:74.2 tons [67.5 metric tons]
Inventory rating:44.6 tons [40.5 metric tons]
Sufficiency rating:94.7

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:73,900 [as of 1998]
Truck traffic:2% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:27.6 tons [25.1 metric tons]
Sufficiency rating:78.6