Share:

E MAIN over SHELL ROCK RIVER

Map 

Coordinates:
+43.08889, -93.57500
43°05'20" N, 93°34'30" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:E MAIN over SHELL ROCK RIVER
Structure number:000000000010050
Location:0882309
Purpose:Carries highway over waterway
Route classification:Major Collector (Rural) [07]
Length of largest span:87.9 ft. [26.8 m]
Total length:176.2 ft. [53.7 m]
Roadway width between curbs:24.9 ft. [7.6 m]
Deck width edge-to-edge:39.4 ft. [12.0 m]
Skew angle:10°
Owner:City or Municipal Highway Agency [04]
Year built:1922
Year reconstructed:1977
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Number of main spans:2
Main spans material:Concrete continuous [2]
Main spans design:Arch - Deck [11]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,100 [as of 2001]
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:29.7 tons [27.0 metric tons]
Inventory rating:17.8 tons [16.2 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:16.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,526,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:3,440 [as of 1997]
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:29.7 tons [27.0 metric tons]
Inventory rating:17.8 tons [16.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:39.9
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$275,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:2,391 [as of 1978]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:29.7 tons [27.0 metric tons]
Inventory rating:17.8 tons [16.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:56.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$275,000