CENTER POINT RD over OVER CC RR

Map 

Coordinates:
+42.05278, -92.12222
42°03'10" N, 92°07'20" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CENTER POINT RD over OVER CC RR
Structure number:000000000033810
Location:0963929
Purpose:Carries highway and pedestrian walkway over railroad
Route classification:Minor Arterial (Urban) [16]
Length of largest span:38.1 ft. [11.6 m]
Total length:212.9 ft. [64.9 m]
Roadway width between curbs:51.8 ft. [15.8 m]
Deck width edge-to-edge:61.0 ft. [18.6 m]
Vertical clearance below bridge:23.0 ft. [7.0 m]
Skew angle:15°
Owner:City or Municipal Highway Agency [04]
Year built:1968
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:M 18 / H 20 [4]
Number of main spans:6
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,900 [as of 2004]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:37.2 tons [33.8 metric tons]
Inventory rating:27.4 tons [24.9 metric tons]
Sufficiency rating:58.4

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,600 [as of 1997]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:37.6 tons [34.2 metric tons]
Inventory rating:27.7 tons [25.2 metric tons]
Sufficiency rating:72.8
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$1,080,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,410 [as of 1987]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:37.6 tons [34.2 metric tons]
Inventory rating:27.7 tons [25.2 metric tons]
Sufficiency rating:62.6
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$750,000