FM over BIG CREEK
Map
Coordinates:
+42.61389, -94.2833342°36'50" N, 94°16'60" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | FM over BIG CREEK |
| Structure number: | 000000000077341 |
| Location: | 0832533 |
| Purpose: | Carries highway over waterway |
| Route classification: | Major Collector (Rural) [07] |
| Length of largest span: | 34.1 ft. [10.4 m] |
| Total length: | 90.9 ft. [27.7 m] |
| Roadway width between curbs: | 29.9 ft. [9.1 m] |
| Deck width edge-to-edge: | 32.2 ft. [9.8 m] |
| Owner: | County Highway Agency [02] |
| Year built: | 1992 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Concrete continuous [2] |
| Main spans design: | Slab [01] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 800 [as of 2007] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 67.5 tons [61.4 metric tons] |
| Inventory rating: | 39.6 tons [36.0 metric tons] |
| Sufficiency rating: | 95.9 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $22,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 690 [as of 1995] |
| Truck traffic: | 12% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Very Good [8 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 76.3 tons [69.4 metric tons] |
| Inventory rating: | 44.6 tons [40.5 metric tons] |
| Sufficiency rating: | 99.7 |
| Recommended work: | Other structural work, including hydraulic replacements. [38] |
| Estimated cost of work: | $15,000 |