Share:

FM over OVER BNSF RR

Map 

Coordinates:
+41.60833, -95.10278
41°36'30" N, 95°06'10" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FM over OVER BNSF RR
Structure number:000000000254460
Location:0713712
Purpose:Carries highway over railroad
Route classification:Minor Collector (Rural) [08]
Length of largest span:39.0 ft. [11.9 m]
Total length:143.1 ft. [43.6 m]
Roadway width between curbs:15.1 ft. [4.6 m]
Deck width edge-to-edge:17.1 ft. [5.2 m]
Vertical clearance below bridge:20.0 ft. [6.1 m]
Skew angle:45°
Owner:Railroad [27]
Year built:1913
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Main span material:Steel [3]
Main span design:Truss - Thru [10]
Deck type:Wood or Timber [8]
Wearing surface:Gravel [8]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:70 [as of 2008]
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:19.6 tons [17.8 metric tons]
Inventory rating:12.8 tons [11.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:16.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$570,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:70 [as of 1996]
Truck traffic:15% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:19.8 tons [18.0 metric tons]
Inventory rating:12.9 tons [11.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:23.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$386,000

1992 Inspection 

Status:Posted for load [P]
Average daily traffic:45 [as of 1988]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:19.8 tons [18.0 metric tons]
Inventory rating:15.8 tons [14.4 metric tons]
Sufficiency rating:46.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$175,000