Share:

LOCAL ROAD over UPPER IOWA RIVER

Map 

Coordinates:
+43.41111, -91.89167
43°24'40" N, 91°53'30" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:LOCAL ROAD over UPPER IOWA RIVER
Structure number:000000000348840
Location:0990910
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:100.1 ft. [30.5 m]
Total length:248.0 ft. [75.6 m]
Roadway width between curbs:15.1 ft. [4.6 m]
Deck width edge-to-edge:16.1 ft. [4.9 m]
Vertical clearance above deck:11.8 ft. [3.6 m]
Owner:County Highway Agency [02]
Year built:1924
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Number of main spans:2
Main spans material:Steel [3]
Main spans design:Truss - Thru [10]
Deck type:Concrete Cast-in-Place [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:50 [as of 2001]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:31.7 tons [28.8 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:28.1
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$396,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:50 [as of 1993]
Truck traffic:14% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge with "unknown" foundation that has not been evaluated for scour. [U]
Operating rating:31.7 tons [28.8 metric tons]
Inventory rating:19.8 tons [18.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:46.2
Recommended work:Bridge rehabilitation because of general structure deterioration or inadequate strength. [35]
Estimated cost of work:$396,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:45 [as of 1984]
Truck traffic:4% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:22.2 tons [20.2 metric tons]
Inventory rating:13.6 tons [12.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:48.2
Estimated cost of work:$396,000