Share:

I- 57 NB over I- 94 SB BF & CTA RR

Map 

Coordinates:
+41.71763, -87.62482
41°43'03" N, 87°37'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I- 57 NB over I- 94 SB BF & CTA RR
Structure number:000016007322693
Location:1 M E IL 1
Purpose:Carries highway overpass over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:191.0 ft. [58.2 m]
Total length:191.0 ft. [58.2 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:56.1 ft. [17.1 m]
Vertical clearance above deck:15.1 ft. [4.6 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Owner:State Highway Agency [01]
Year built:1960
Year reconstructed:2007
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Prestressed concrete [5]
Main spans design:Box beam or girders - Multiple [05]
Deck type:Concrete Precast Panels [2]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:26,850 [as of 2008]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:98.0 tons [89.1 metric tons]
Inventory rating:84.2 tons [76.5 metric tons]
Sufficiency rating:87.9

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,100 [as of 1998]
Truck traffic:11% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:98.0 tons [89.1 metric tons]
Inventory rating:98.0 tons [89.1 metric tons]
Sufficiency rating:88.7

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:97,600 [as of 1991]
Truck traffic:2% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Sufficiency rating:83.0