Share:

I- 90,94 DAN RYAN over MAXWELL TO 15TH ST

Map 

Coordinates:
+41.86131, -87.64424
41°51'41" N, 87°38'39" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I- 90,94 DAN RYAN over MAXWELL TO 15TH ST
Structure number:000016013703834
Location:0.2 M S ROOSEVELT RD
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:86.9 ft. [26.5 m]
Total length:1214.3 ft. [370.1 m]
Roadway width between curbs:158.1 ft. [48.2 m]
Deck width edge-to-edge:163.7 ft. [49.9 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Owner:State Highway Agency [01]
Year built:1962
Year reconstructed:1988
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:15
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Other [9]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:253,000 [as of 2008]
Truck traffic:4% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:61.4 tons [55.8 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Sufficiency rating:82.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:299,500 [as of 1998]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:61.4 tons [55.8 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Sufficiency rating:81.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:254,100 [as of 1991]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:61.4 tons [55.8 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Sufficiency rating:79.0
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$17,996,000