US 12,45 MANNHEIM over IL 64 (NORTH AVE)

Map 

Coordinates:
+41.90753, -87.88366
41°54'27" N, 87°53'01" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:US 12,45 MANNHEIM over IL 64 (NORTH AVE)
Structure number:000016033604074
Location:0.7 M N US 20
Purpose:Carries highway overpass over highway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:50.9 ft. [15.5 m]
Total length:106.6 ft. [32.5 m]
Roadway width between curbs:78.1 ft. [23.8 m]
Deck width edge-to-edge:102.0 ft. [31.1 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Owner:State Highway Agency [01]
Year built:1931
Year reconstructed:1975
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Integral Concrete (separate non-modified layer of concrete added to structural deck) [2]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:39,500 [as of 2009]
Truck traffic:8% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:86.1 tons [78.3 metric tons]
Inventory rating:51.5 tons [46.8 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:93.0
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$829,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:33,900 [as of 1998]
Truck traffic:11% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.4 tons [53.1 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.8
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$829,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:38,400 [as of 1990]
Truck traffic:11% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:58.4 tons [53.1 metric tons]
Inventory rating:37.6 tons [34.2 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.2
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$829,000