Share:

39TH ST (PERSHING over RACINE AVE & RR

Map 

Coordinates:
+41.82330, -87.65595
41°49'24" N, 87°39'21" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:39TH ST (PERSHING over RACINE AVE & RR
Structure number:000016039604118
Location:1.3 W I-94
Purpose:Carries highway over highway and railroad
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:107.0 ft. [32.6 m]
Total length:652.3 ft. [198.8 m]
Roadway width between curbs:47.9 ft. [14.6 m]
Deck width edge-to-edge:56.4 ft. [17.2 m]
Vertical clearance below bridge:14.1 ft. [4.3 m]
Owner:State Highway Agency [01]
Year built:1936
Year reconstructed:1979
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:13
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,000 [as of 2006]
Truck traffic:17% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:25.7 tons [23.4 metric tons]
Inventory rating:12.9 tons [11.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:2.0
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$6,950,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,500 [as of 1998]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:57.4 tons [52.2 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:65.2
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$6,950,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:18,600 [as of 1990]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:53.5 tons [48.6 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:67.3
Recommended work:Bridge deck rehabilitation with only incidental widening. [36]
Estimated cost of work:$6,950,000