Share:

ELSTON AVE over I- 94 EDENS

Map 

Coordinates:
+41.97237, -87.74720
41°58'21" N, 87°44'50" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ELSTON AVE over I- 94 EDENS
Structure number:000016061004276
Location:0.6 M N I-90,94
Purpose:Carries highway overpass over highway
Route classification:Collector (Urban) [17]
Length of largest span:71.9 ft. [21.9 m]
Total length:151.3 ft. [46.1 m]
Roadway width between curbs:49.9 ft. [15.2 m]
Deck width edge-to-edge:68.9 ft. [21.0 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Skew angle:40°
Owner:State Highway Agency [01]
Year built:1957
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:2
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,100 [as of 2006]
Truck traffic:10% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:67.3 tons [61.2 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:63.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$227,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,400 [as of 1998]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$227,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,700 [as of 1986]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:62.4 tons [56.7 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:79.0
Recommended work:Other structural work, including hydraulic replacements. [38]
Estimated cost of work:$227,000