Share:

WENTWORTH AVE over I- 90,94 RYAN

Map 

Coordinates:
+41.77819, -87.63001
41°46'41" N, 87°37'48" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:WENTWORTH AVE over I- 90,94 RYAN
Structure number:000016100726267
Location:0.2 M W STATE ST
Purpose:Carries highway over highway and railroad
Route classification:Collector (Urban) [17]
Length of largest span:160.1 ft. [48.8 m]
Total length:500.0 ft. [152.4 m]
Roadway width between curbs:29.9 ft. [9.1 m]
Deck width edge-to-edge:43.0 ft. [13.1 m]
Vertical clearance below bridge:15.1 ft. [4.6 m]
Owner:State Highway Agency [01]
Year built:1960
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,800 [as of 2006]
Truck traffic:14% of total traffic
Deck condition:Very Good [8 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:71.3 tons [64.8 metric tons]
Inventory rating:42.6 tons [38.7 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$4,967,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,009 [as of 1997]
Truck traffic:3% of total traffic
Deck condition:Serious [3 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:75.2 tons [68.4 metric tons]
Inventory rating:43.6 tons [39.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:61.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$4,967,000

1992 Inspection 

Status:Open, no restriction [A]
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:75.2 tons [68.4 metric tons]
Inventory rating:43.6 tons [39.6 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:84.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$112,000