I- 90,94 SB TOI-55 over ARCHER, BNSF & IC RR
Map
Coordinates:
+41.84569, -87.6495141°50'44" N, 87°38'58" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I- 90,94 SB TOI-55 over ARCHER, BNSF & IC RR |
| Structure number: | 000016106226380 |
| Location: | 0.1 M W I-94 |
| Purpose: | Carries highway overpass (third level) over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Length of largest span: | 65.9 ft. [20.1 m] |
| Total length: | 617.2 ft. [188.1 m] |
| Roadway width between curbs: | 30.5 ft. [9.3 m] |
| Deck width edge-to-edge: | 33.8 ft. [10.3 m] |
| Vertical clearance below bridge: | 18.0 ft. [5.5 m] |
| Skew angle: | 15° |
| Owner: | State Highway Agency [01] |
| Year built: | 1964 |
| Year reconstructed: | 1990 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Number of main spans: | 12 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 48,000 [as of 2002] |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 95.0 tons [86.4 metric tons] |
| Inventory rating: | 56.4 tons [51.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 81.0 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $1,833,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 38,700 [as of 1994] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 75.0 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $1,833,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 32,600 [as of 1984] |
| Deck condition: | Excellent [9 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Very Good [8 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 75.0 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $1,833,000 |