I- 90,94 SB TOI-55 over ARCHER, BNSF & IC RR

Map 

Coordinates:
+41.84569, -87.64951
41°50'44" N, 87°38'58" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I- 90,94 SB TOI-55 over ARCHER, BNSF & IC RR
Structure number:000016106226380
Location:0.1 M W I-94
Purpose:Carries highway overpass (third level) over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:65.9 ft. [20.1 m]
Total length:617.2 ft. [188.1 m]
Roadway width between curbs:30.5 ft. [9.3 m]
Deck width edge-to-edge:33.8 ft. [10.3 m]
Vertical clearance below bridge:18.0 ft. [5.5 m]
Skew angle:15°
Owner:State Highway Agency [01]
Year built:1964
Year reconstructed:1990
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:12
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:48,000 [as of 2002]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:95.0 tons [86.4 metric tons]
Inventory rating:56.4 tons [51.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:81.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,833,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:38,700 [as of 1994]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,833,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:32,600 [as of 1984]
Deck condition:Excellent [9 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:75.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$1,833,000