Facts 

Name:I- 90,94 RYAN ELEV over S BR CHI RIVER
Structure number:000016111426274
Location:0.2 M N I-55
Purpose:Carries highway over waterway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:220.2 ft. [67.1 m]
Total length:517.1 ft. [157.6 m]
Roadway width between curbs:144.0 ft. [43.9 m]
Deck width edge-to-edge:148.0 ft. [45.1 m]
Vertical clearance below bridge:59.7 ft. [18.2 m]
Owner:State Highway Agency [01]
Year built:1962
Year reconstructed:1988
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18+Mod / HS 20+Mod [6]
Number of main spans:3
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Other [9]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:167,500 [as of 2008]
Truck traffic:6% of total traffic
Deck condition:Fair [5 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Operating rating:65.3 tons [59.4 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Sufficiency rating:73.0

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:210,800 [as of 1998]
Truck traffic:11% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:In place and functioning [2]
Scour condition:Bridge foundations (including piles) on dry land well above flood water elevations. [9]
Operating rating:65.3 tons [59.4 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Sufficiency rating:73.0

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:239,000 [as of 1991]
Truck traffic:7% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Pier/abutment protection:Navigation protection not required [1]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:65.3 tons [59.4 metric tons]
Inventory rating:38.6 tons [35.1 metric tons]
Sufficiency rating:85.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$7,575,000