I- 94 NB TO I-55 W over I- 55 STEVENSON

Map 

Coordinates:
+41.84714, -87.64152
41°50'50" N, 87°38'29" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:I- 94 NB TO I-55 W over I- 55 STEVENSON
Structure number:000016114026262
Location:0.1 M W I-94
Purpose:Carries highway over highway
Route classification:Principal Arterial - Interstate (Urban) [11]
Length of largest span:80.1 ft. [24.4 m]
Total length:744.1 ft. [226.8 m]
Roadway width between curbs:22.0 ft. [6.7 m]
Deck width edge-to-edge:29.9 ft. [9.1 m]
Vertical clearance below bridge:24.9 ft. [7.6 m]
Owner:State Highway Agency [01]
Year built:1964
Year reconstructed:1989
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:8
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Other [9]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:16,900 [as of 2002]
Truck traffic:5% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:90.8

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,600 [as of 1994]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:96.8

1992 Inspection 

Status:Open, no restriction [A]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Very Good [8 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Sufficiency rating:98.0
Recommended work:Bridge deck replacement with only incidental widening. [37]
Estimated cost of work:$75,000