Share:

MONROE ST over I- 90,94 JFK

Map 

Coordinates:
+41.88051, -87.64550
41°52'50" N, 87°38'44" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:MONROE ST over I- 90,94 JFK
Structure number:000016205426315
Location:0.3 M N I-290
Purpose:Carries highway overpass over highway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:101.1 ft. [30.8 m]
Total length:282.2 ft. [86.0 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:62.0 ft. [18.9 m]
Vertical clearance below bridge:14.4 ft. [4.4 m]
Owner:State Highway Agency [01]
Year built:1955
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:4
Main spans material:Steel continuous [4]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Other [9]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:15,900 [as of 2006]
Truck traffic:15% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:84.2 tons [76.5 metric tons]
Inventory rating:50.5 tons [45.9 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,573,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,400 [as of 1986]
Deck condition:Poor [4 out of 9]
Superstructure condition:Serious [3 out of 9]
Substructure condition:Poor [4 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:71.3 tons [64.8 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:32.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,573,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,400 [as of 1986]
Deck condition:Poor [4 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:71.3 tons [64.8 metric tons]
Inventory rating:40.6 tons [36.9 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:63.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,573,000