Share:

ADAMS ST over S BR CHICAGO RIV

Map 

Coordinates:
+41.87931, -87.63774
41°52'46" N, 87°38'16" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:ADAMS ST over S BR CHICAGO RIV
Structure number:000016600127340
Location:100 S & 380 W
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:199.2 ft. [60.7 m]
Total length:250.0 ft. [76.2 m]
Roadway width between curbs:38.1 ft. [11.6 m]
Deck width edge-to-edge:64.0 ft. [19.5 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1927
Year reconstructed:1996
Historic significance:Bridge is possibly eligible for the National Register of Historic Places [3]
Main span material:Steel [3]
Main span design:Movable - Bascule [16]
Deck type:Open Grating [3]
Wearing surface:Other [9]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,300 [as of 2006]
Truck traffic:22% of total traffic
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is being eroded. River control devices and/or embankment have major damage. Trees and rush restrict the channel. [5]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:68.5

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,000 [as of 1986]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Sufficiency rating:68.5

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:11,000 [as of 1986]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:57.5
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,046,000