Share:

CHICAGO AVE over N BR CHICAGO RIVER

Map 

Coordinates:
+41.89646, -87.64447
41°53'47" N, 87°38'40" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:CHICAGO AVE over N BR CHICAGO RIVER
Structure number:000016600826624
Location:622 W CHGO AVE P5C
Purpose:Carries highway over waterway
Route classification:Minor Arterial (Urban) [16]
Length of largest span:189.0 ft. [57.6 m]
Total length:291.0 ft. [88.7 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:60.0 ft. [18.3 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Owner:City or Municipal Highway Agency [04]
Year built:1914
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Main span material:Steel [3]
Main span design:Movable - Bascule [16]
Deck type:Open Grating [3]
Wearing surface:Other [9]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:22,300 [as of 2006]
Truck traffic:16% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:28.7 tons [26.1 metric tons]
Inventory rating:16.8 tons [15.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:11.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,421,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,400 [as of 1994]
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:There are no noticeable or noteworthy deficiencies which affect the condition of the channel. [9]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.8
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,421,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:17,600 [as of 1986]
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:48.2
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$1,421,000