Facts 

Name:KINZIE ST over N BR CHICAGO RIV
Structure number:000016602826628
Location:423 W KINZIE
Purpose:Carries highway over waterway
Route classification:Collector (Urban) [17]
Length of largest span:136.2 ft. [41.5 m]
Total length:194.9 ft. [59.4 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:60.0 ft. [18.3 m]
Vertical clearance above deck:11.5 ft. [3.5 m]
Vertical clearance below bridge:15.7 ft. [4.8 m]
Skew angle:
Owner:City or Municipal Highway Agency [04]
Year built:1909
Year reconstructed:1999
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Design load:MS 18 / HS 20 [5]
Main span material:Steel [3]
Main span design:Movable - Bascule [16]
Deck type:Open Grating [3]
Wearing surface:Other [9]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:8,500 [as of 2006]
Truck traffic:12% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$927,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,809 [as of 1998]
Deck condition:Excellent [9 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:74.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$927,000

1992 Inspection 

Status:Open, no restriction [A]
Deck condition:Good [7 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Pier/abutment protection:In place but in a deteriorated condition [3]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:57.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$927,000