STATE ST over MAIN BR CHICAGO RIV
Map
Coordinates:
+41.88783, -87.6279241°53'16" N, 87°37'41" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | STATE ST over MAIN BR CHICAGO RIV |
| Structure number: | 000016604827322 |
| Location: | 309 N STATE P |
| Purpose: | Carries highway over waterway |
| Route classification: | Collector (Urban) [17] |
| Length of largest span: | 245.1 ft. [74.7 m] |
| Total length: | 307.1 ft. [93.6 m] |
| Roadway width between curbs: | 71.9 ft. [21.9 m] |
| Deck width edge-to-edge: | 107.9 ft. [32.9 m] |
| Vertical clearance below bridge: | 21.0 ft. [6.4 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1949 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Main span material: | Steel [3] |
| Main span design: | Movable - Bascule [16] |
| Deck type: | Closed Grating [4] |
| Wearing surface: | Other [9] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 10,700 [as of 2006] |
| Truck traffic: | 22% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 67.5 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $3,501,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,900 [as of 1991] |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 66.5 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $3,501,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 14,900 [as of 1991] |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Pier/abutment protection: | In place and functioning [2] |
| Scour condition: | Bridge foundations determined to be stable for the assessed or calculated scour condition. [8] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 26.7 tons [24.3 metric tons] |
| Sufficiency rating: | 80.5 |