C&WI RR over GARFIELD BLVD
Map
Coordinates:
+41.79438, -87.6401441°47'40" N, 87°38'25" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | C&WI RR over GARFIELD BLVD |
| Structure number: | 000016606423183 |
| Location: | 0.5 M W STATE P7C |
| Purpose: | Carries railroad over highway |
| Route classification: | Other Principal Arterial (Urban) [14] |
| Length of largest span: | 66.9 ft. [20.4 m] |
| Total length: | 184.1 ft. [56.1 m] |
| Main span material: | Steel [3] |
| Main span design: | Other [00] |
2010 Inspection
| Average daily traffic: | 12,650 [as of 2006] |
| Truck traffic: | 7% of total traffic |
2000 Inspection
| Average daily traffic: | 15,500 [as of 1993] |
| Evaluation: | Not applicable [N] |
1992 Inspection
| Average daily traffic: | 31,000 |