DEARBORN ST over C&NW & CARROL AVE

Map 

Coordinates:
+41.88569, -87.62950
41°53'08" N, 87°37'46" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:DEARBORN ST over C&NW & CARROL AVE
Structure number:000016611527309
Location:36W&330N TO 400N
Purpose:Carries highway over railroad
Route classification:Collector (Urban) [17]
Length of largest span:64.0 ft. [19.5 m]
Total length:248.0 ft. [75.6 m]
Roadway width between curbs:56.1 ft. [17.1 m]
Deck width edge-to-edge:85.3 ft. [26.0 m]
Vertical clearance below bridge:17.1 ft. [5.2 m]
Owner:City or Municipal Highway Agency [04]
Year built:1963
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:5
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:22,900 [as of 2006]
Truck traffic:12% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,347,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,009 [as of 1999]
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:77.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$3,347,000

1992 Inspection 

Status:Open, no restriction [A]
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:92.0