Share:

BEAUBIEN over LOWER LEVEL BEAUBIEN

Map 

Coordinates:
+41.88516, -87.62391
41°53'07" N, 87°37'26" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:BEAUBIEN over LOWER LEVEL BEAUBIEN
Structure number:000016613527233
Location:LAKE ST TO RANDOLPH
Purpose:Carries highway over highway
Route classification:Collector (Urban) [17]
Length of largest span:41.3 ft. [12.6 m]
Total length:378.0 ft. [115.2 m]
Roadway width between curbs:36.1 ft. [11.0 m]
Deck width edge-to-edge:49.9 ft. [15.2 m]
Vertical clearance below bridge:13.5 ft. [4.1 m]
Owner:City or Municipal Highway Agency [04]
Year built:1956
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:10
Main spans material:Steel [3]
Main spans design:Stringer/Multi-beam or girder [02]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,500 [as of 2002]
Deck condition:Fair [5 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:66.3 tons [60.3 metric tons]
Inventory rating:39.6 tons [36.0 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:76.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,994,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:13,000 [as of 1994]
Deck condition:Fair [5 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:49.0
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$2,994,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:1 [as of 1979]
Deck condition:Good [7 out of 9]
Superstructure condition:Satisfactory [6 out of 9]
Substructure condition:Good [7 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:35.6 tons [32.4 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:92.0