FULLERTON PARKWAY over PED UNDERPASS

Map 

Coordinates:
+41.92595, -87.63211
41°55'33" N, 87°37'56" W
Source: National Bridge Inventory (2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:FULLERTON PARKWAY over PED UNDERPASS
Structure number:000016621729284
Location:2400 N.AND 100 E.
Route classification:Minor Arterial (Urban) [16]
Length of largest span:11.5 ft. [3.5 m]
Total length:26.9 ft. [8.2 m]
Roadway width between curbs:44.0 ft. [13.4 m]
Deck width edge-to-edge:76.1 ft. [23.2 m]
Vertical clearance above deck:20.0 ft. [6.1 m]
Owner:City or Municipal Highway Agency [04]
Year built:1940
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Number of main spans:2
Main spans material:Concrete [1]
Main spans design:Frame [07]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:10,350 [as of 2006]
Truck traffic:11% of total traffic
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Fair [5 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:37.6 tons [34.2 metric tons]
Inventory rating:22.8 tons [20.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:54.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$162,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:9,250 [as of 1998]
Deck condition:Poor [4 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Scour condition:Bridge not over waterway. [N]
Operating rating:48.5 tons [44.1 metric tons]
Inventory rating:35.6 tons [32.4 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:67.0
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$162,000