I-90 SKYWAY over EWING,100TH & AVE"L"
Map
Coordinates:
+41.71351, -87.5352741°42'49" N, 87°32'07" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-90 SKYWAY over EWING,100TH & AVE"L" |
| Structure number: | 000016642305760 |
| Location: | AT 100TH ST |
| Purpose: | Carries highway over highway |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Tolls: | Yes, on toll road [2] |
| Length of largest span: | 225.4 ft. [68.7 m] |
| Total length: | 734.9 ft. [224.0 m] |
| Roadway width between curbs: | 77.4 ft. [23.6 m] |
| Deck width edge-to-edge: | 83.0 ft. [25.3 m] |
| Vertical clearance below bridge: | 19.4 ft. [5.9 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1958 |
| Year reconstructed: | 2003 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 4 |
| Main spans material: | Steel continuous [4] |
| Main spans design: | Truss - Thru [10] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Latex Concrete or similar additive [3] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 47,900 [as of 2009] |
| Truck traffic: | 11% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 61.4 tons [55.8 metric tons] |
| Inventory rating: | 36.6 tons [33.3 metric tons] |
| Sufficiency rating: | 65.0 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $4,356,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 24,900 [as of 1995] |
| Truck traffic: | 11% of total traffic |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 33.7 tons [30.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 59.9 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $4,356,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 24,200 [as of 1991] |
| Truck traffic: | 9% of total traffic |
| Deck condition: | Satisfactory [6 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 33.7 tons [30.6 metric tons] |
| Evaluation: | Functionally obsolete [2] |
| Sufficiency rating: | 70.7 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $4,356,000 |