I-90WB TO NB STONY over GROUND
Map
Coordinates:
+41.75468, -87.5856641°45'17" N, 87°35'08" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | I-90WB TO NB STONY over GROUND |
| Structure number: | 000016647606168 |
| Location: | 0.12 M N 79TH P7C |
| Route classification: | Principal Arterial - Interstate (Urban) [11] |
| Tolls: | Yes, on toll road [2] |
| Length of largest span: | 57.4 ft. [17.5 m] |
| Total length: | 181.1 ft. [55.2 m] |
| Roadway width between curbs: | 22.0 ft. [6.7 m] |
| Deck width edge-to-edge: | 25.3 ft. [7.7 m] |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1958 |
| Year reconstructed: | 1998 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Design load: | MS 18 / HS 20 [5] |
| Number of main spans: | 3 |
| Main spans material: | Steel [3] |
| Main spans design: | Stringer/Multi-beam or girder [02] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,009 [as of 2000] |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Good [7 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 99.4 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $545,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 4,009 [as of 1995] |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Poor [4 out of 9] |
| Substructure condition: | Fair [5 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 48.5 tons [44.1 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 69.1 |
| Recommended work: | Bridge rehabilitation because of general structure deterioration or inadequate strength. [35] |
| Estimated cost of work: | $545,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Scour condition: | Bridge not over waterway. [N] |
| Operating rating: | 35.6 tons [32.4 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 84.0 |