ULAH ROAD over EDWARDS RIVER
Map
Coordinates:
+41.27745, -90.1456641°16'39" N, 90°08'44" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.
Facts
| Name: | ULAH ROAD over EDWARDS RIVER |
| Structure number: | 000037010008535 |
| Location: | 1.2 MI S JCT ILL 81 |
| Purpose: | Carries highway over waterway |
| Route classification: | Local (Rural) [09] |
| Length of largest span: | 100.1 ft. [30.5 m] |
| Total length: | 105.3 ft. [32.1 m] |
| Roadway width between curbs: | 20.0 ft. [6.1 m] |
| Deck width edge-to-edge: | 21.3 ft. [6.5 m] |
| Vertical clearance above deck: | 14.4 ft. [4.4 m] |
| Owner: | State Highway Agency [01] |
| Year built: | 1933 |
| Year reconstructed: | 2000 |
| Historic significance: | Bridge is possibly eligible for the National Register of Historic Places [3] |
| Design load: | MS 18 / HS 20 [5] |
| Main span material: | Steel [3] |
| Main span design: | Truss - Thru [10] |
| Deck type: | Concrete Cast-in-Place [1] |
| Wearing surface: | Monolithic Concrete (concurrently placed with structural deck) [1] |
2010 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 200 [as of 2006] |
| Truck traffic: | 20% of total traffic |
| Deck condition: | Very Good [8 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7] |
| Scour condition: | Countermeasures have been installed to mitigate an existing problem with scour. [7] |
| Operating rating: | 57.4 tons [52.2 metric tons] |
| Inventory rating: | 35.6 tons [32.4 metric tons] |
| Sufficiency rating: | 67.4 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $453,000 |
2000 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 200 [as of 1996] |
| Truck traffic: | 2% of total traffic |
| Deck condition: | Poor [4 out of 9] |
| Superstructure condition: | Fair [5 out of 9] |
| Substructure condition: | Good [7 out of 9] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Scour condition: | Countermeasures have been installed to mitigate an existing problem with scour. [7] |
| Operating rating: | 32.7 tons [29.7 metric tons] |
| Inventory rating: | 21.8 tons [19.8 metric tons] |
| Evaluation: | Structurally deficient [1] |
| Sufficiency rating: | 48.2 |
| Recommended work: | Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31] |
| Estimated cost of work: | $453,000 |
1992 Inspection
| Status: | Open, no restriction [A] |
| Average daily traffic: | 300 [as of 1991] |
| Deck condition: | Fair [5 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Channel protection: | Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6] |
| Scour condition: | Scour calculation/evaluation has not been made. [6] |
| Operating rating: | 34.7 tons [31.5 metric tons] |
| Inventory rating: | 19.8 tons [18.0 metric tons] |
| Sufficiency rating: | 58.0 |
| Recommended work: | Bridge deck replacement with only incidental widening. [37] |
| Estimated cost of work: | $450,000 |