Facts 

Name:TR 270 over BR OF OAT CREEK
Structure number:000037313908658
Location:6.0 MI SW ATKINSON
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:42.0 ft. [12.8 m]
Total length:43.0 ft. [13.1 m]
Roadway width between curbs:16.1 ft. [4.9 m]
Deck width edge-to-edge:26.9 ft. [8.2 m]
Owner:Town or Township Highway Agency [03]
Year built:1890
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Main span material:Concrete [1]
Main span design:Other [00]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:25 [as of 2006]
Deck condition:Serious [3 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:5.0 tons [4.5 metric tons]
Inventory rating:3.0 tons [2.7 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:19.3
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$153,000

2000 Inspection 

Status:Posted for load [P]
Average daily traffic:49 [as of 1996]
Deck condition:Serious [3 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:11.9 tons [10.8 metric tons]
Inventory rating:8.9 tons [8.1 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:19.1
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$153,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:50 [as of 1986]
Deck condition:Serious [3 out of 9]
Superstructure condition:Poor [4 out of 9]
Substructure condition:Satisfactory [6 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:26.7 tons [24.3 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:41.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$153,000