Share:

TR 55B over MARTINTON DCH NO 3

Map 

Coordinates:
+40.91967, -87.69871
40°55'11" N, 87°41'55" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:TR 55B over MARTINTON DCH NO 3
Structure number:000038450208789
Location:1.25 MI E MARTINTON
Purpose:Carries highway over waterway
Route classification:Local (Rural) [09]
Length of largest span:60.0 ft. [18.3 m]
Total length:66.9 ft. [20.4 m]
Roadway width between curbs:19.7 ft. [6.0 m]
Deck width edge-to-edge:25.6 ft. [7.8 m]
Skew angle:45°
Owner:Town or Township Highway Agency [03]
Year built:1929
Historic significance:Bridge is eligible for the National Register of Historic Places [2]
Main span material:Concrete [1]
Main span design:Other [00]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Bituminous [6]

2010 Inspection 

Status:Posted for load [P]
Average daily traffic:700 [as of 2008]
Deck condition:Good [7 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Poor [4 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:27.7 tons [25.2 metric tons]
Inventory rating:16.8 tons [15.3 metric tons]
Evaluation:Structurally deficient [1]
Sufficiency rating:29.9
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$273,000

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:225 [as of 1977]
Truck traffic:4% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for assessed or calculated scour condition. [5]
Operating rating:36.6 tons [33.3 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:62.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$273,000

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:225 [as of 1977]
Deck condition:Good [7 out of 9]
Superstructure condition:Very Good [8 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:26.7 tons [24.3 metric tons]
Inventory rating:26.7 tons [24.3 metric tons]
Evaluation:Functionally obsolete [2]
Sufficiency rating:73.4
Recommended work:Widening of existing bridge with deck rehabilitation or replacement. [34]
Estimated cost of work:$178,000