SR 9 over BLUE RIVER

Map 

Coordinates:
+41.15333, -85.48833
41°09'12" N, 85°29'18" W
Source: National Bridge Inventory (1992, 2000, 2010 editions)
Information not verified. Use at your own risk.

Facts 

Name:SR 9 over BLUE RIVER
Structure number:002780
Location:0.3 S SR 205
Purpose:Carries highway and pedestrian walkway over waterway
Route classification:Other Principal Arterial (Urban) [14]
Length of largest span:40.0 ft. [12.2 m]
Total length:106.0 ft. [32.3 m]
Roadway width between curbs:40.0 ft. [12.2 m]
Deck width edge-to-edge:49.9 ft. [15.2 m]
Skew angle:20°
Owner:State Highway Agency [01]
Year built:1996
Historic significance:Bridge is not eligible for the National Register of Historic Places [5]
Design load:MS 18 / HS 20 [5]
Number of main spans:3
Main spans material:Concrete continuous [2]
Main spans design:Slab [01]
Deck type:Concrete Cast-in-Place [1]
Wearing surface:Monolithic Concrete (concurrently placed with structural deck) [1]

2010 Inspection 

Status:Open, no restriction [A]
Average daily traffic:14,674 [as of 2004]
Truck traffic:5% of total traffic
Deck condition:Good [7 out of 9]
Superstructure condition:Good [7 out of 9]
Substructure condition:Good [7 out of 9]
Channel protection:Bank protection is in need of minor repairs. River control devices and embankment protection have a little minor damage. Banks and/or channel have minor amounts of drift. [7]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:82.2 tons [74.7 metric tons]
Inventory rating:49.5 tons [45.0 metric tons]
Sufficiency rating:94.8

2000 Inspection 

Status:Open, no restriction [A]
Average daily traffic:12,380 [as of 1994]
Deck condition:Very Good [8 out of 9]
Superstructure condition:Excellent [9 out of 9]
Substructure condition:Very Good [8 out of 9]
Channel protection:Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8]
Scour condition:Bridge foundations determined to be stable for the assessed or calculated scour condition. [8]
Operating rating:68.3 tons [62.1 metric tons]
Inventory rating:41.6 tons [37.8 metric tons]
Sufficiency rating:93.5

1992 Inspection 

Status:Open, no restriction [A]
Average daily traffic:7,300 [as of 1985]
Deck condition:Satisfactory [6 out of 9]
Superstructure condition:Fair [5 out of 9]
Substructure condition:Fair [5 out of 9]
Channel protection:Bank is beginning to slump. River control devices and embankment protection have widespread minor damage. There is minor stream bed movement evident. Debris is restricting the channel slightly. [6]
Scour condition:Scour calculation/evaluation has not been made. [6]
Operating rating:48.3 tons [43.9 metric tons]
Inventory rating:24.8 tons [22.5 metric tons]
Sufficiency rating:81.4
Recommended work:Replacement of bridge or other structure because of substandard load carrying capacity or substantial bridge roadway geometry. [31]
Estimated cost of work:$460,000